Construction Costs Year 2015

Construction Costs Year 2015


pdf UKM 4 dt. 30.09.15 Kosto mes.ndert.banesave 2015

In this value of average cost are not included the values ​​of:
1. The engineering network
2. Projects
3. Geological and seismic study
4. Construction permit
5. Land
6. ECB Operational Expenses 4%

kosto2015

grafiku i kostos

21589 Total Views 6 Views Today