Construction Costs Year 2008
UDHEZIM
BUILDING COST OF CONSTRUCTION FOR YEAR 2008
In this value of average cost are not included the values of:
1. The engineering network.
2. Projects.
3. Geological and seismic study.
4. Construction permit.
5. Land.
6. ECB Operational Expenses 4%
7784 Total Views 4 Views Today