Construction Costs Year 2012
In this value of average cost are not included the values of:
1. The engineering network.
2. Projects.
3. Geological and seismic study.
4. Construction permit.
5. Land.
6. ECB Operational Expenses 4%
10336 Total Views 6 Views Today