Construction costs Year 2016
INSTRUCTION Nr. 3, datë 28.12.2016
In this value of average cost are not included the values of:
1. The engineering network
2. Projects
3. Geological and seismic study
4. Construction permit
5. Land
6. ECB Operational Expenses 4%
24536 Total Views 10 Views Today