Procurement

05.02.2018

Procurement 2015

PROCUREMENTS FOR THE JANUARY-JUNE 2015 PERIOD


1. The object of the procurement: “Type 83/5 Building, 8 floors with 35 apartments and 1 (one) storey unit in Librazhd” Total limit fund: 100 409 780 (including the value of Elevator) . Source of funding: ECB funds In process (at the stage of announcing the tender notice, which will be held on 16.07.2015)

2. Open Sale Auction: “6 local (service premises respectively with surface: No.1 67.34 m2, No.2 74.77 m2, No.3 47.59 m2, No.4 78.08 m2, No.5 41.66 m2 and No .6 51.55 m2) on the ground floor of the apartment type 83/5, built with the ECB funds in the city of Fier “Initial Auction Value (VAM): 56 000 lek / m2 (including VAT value) . In process (to be held on 6.07.2015). For more info click here

3. Open auction with sale premises: “3 local (service area respectively with surface: No.1 120 m2, No.2 56 m2, No.3 130 m2), on the ground floor of the apartment with 8 floors, special type , built with ECB funds in the city of Saranda “Initial Auction Value (VAM): 700 € / m2 (including VAT value). In process (held on 13.07.2015) For more info click here

4. Procurement Object: “Design Services for Realization of Low Cost and Energy Efficiency Housing in Korça” Source of Financing: ECB Funds and UNDP. In the process, (the first phase of this procedure has been completed, we are in the phase of evaluating the “Technical Proposals” of the candidates announced as winners from the first phase)

5. Procurement object: “Building type 83/5, 8 storeys with 38 apartments and 3 (three) service units in Lushnja town” Total limit fund: 95 285 973 (including the value of Elevator) ALL without VAT. Source of funding: ECB funds. In the process, (at the stage of signing the contract)

6. Procurement object: “Supervision of works on type 83/5, 8 storeys with 35 apartments and one unit of service in the city of Berat” Total limit: 1 120 134 lekë pa TVSH. Source of funding: ECB funds. It was concluded with the conclusion of the contract on 25.05.2015

7. Open tender with procurement object: “Flat type 83/5, 8 storeys with 35 apartments and one floor service unit” in the city of Berat. Total limit fund: 98.168.308 (including the value of the elevator) ALL (excluding VAT). Source of funding: ECB funds. It ended with the conclusion of the contract on 23.03.2015

8. Open Sale Auction: “6 local (service spaces respectively with surface: no. 64.94 m², no. 71.55 m², no.3 41.47 m², no.4 77.44 m², no.5 35.53 m², and No. 52.84 m²) on the ground floor of the apartment type 83/5 built with ECB funds in the city of Kavaja “. Initial Value (VAM): 46 667 Lek / m² without VAT (forty-six thousand six hundred and seventy-seven / sq. Lek without VAT). Completed with the contract signing on 10.03.2015 for three service units There are for sale and 3 (three) service units respectively with surface: No. 2 71.55 m², No. 3 41.47 m², No. 4 77.44 m². For more info click here

Procurement 2016

PROCUREMENT FOR JANUARY-DECEMBER 2016


  1. Procurement object: “Low Cost and Energy Efficiency, Building No. 2, in Korça”. Source of funding: ECB funds. The procedure completed with the conclusion of the contract on the 11.08.2016, with the winning the merger of economic operator “LLAZO shpk & ALUERA shpk”.
  2. Procurement object: “Low cost and energy efficiency, building no.1, in Korça”. Source of funding: ECB funds. The procedure concluded with the conclusion of the contract on the 11.08.2016, with the winning economic operator “PIENVIS shpk”.
  3. Procurement object: “Engineering network in facility type 83/5, 8 floors in the city of Fier”. Source of funding: ECB funds. The procedure concluded with the conclusion of the contract on 24.06.2016, with the winning economic operator “SARDO shpk”.
  4. Procurement object: “Engineering network in facility type 83/5, 8 floors in the city of Lushnje”. Source of funding: ECB funds. The procedure completed with the conclusion of the contract on 23.09.2016, with the winning economic operator “INA shpk”.
  5. Procurement subject: “Study designing two 6 and 8-floor flats”. Source of funding: ECB funds. The procedure concluded with the conclusion of the contract on 28.04.2016, with the winning economic operator “SPHAERA shpk”.
  6. Procurement object: “Oversight of Low Cost Housing and Energy Efficiency, Building No. 1, in Korça. Source of funding: ECB funds. The procedure completed with the conclusion of the contract on 09.09.2016, with the winning economic operator “A.SH.ENGINERING shpk.
  7. Procurement object: “Oversight of low cost and energy efficiency building, No. 2, in Korça”. Source of funding: ECB funds. The procedure completed with the conclusion of the contract on the 30.08.2016, with the winning economic operator “ZENIT-06 shpk”
11714 Total Views 2 Views Today